Consolidation of foundation soil for the pillars of “Fadalto” viaduct during the construction of the A27 motorway Mestre - Pian di Vedoia, section from Vittorio Veneto to Pian di Vedoia.
1989 | 1990
Jet Grouting vertical treatment for the construction of shaft foundations of Fadalto viaduct - columns diameter Ø 1200 mm - unconfined compressive strength 18 MPa at 28 days - about 130.000 m - maximum depth over 25 m.