Santa Margarida (Barcelona - Spain)

High Speed Railway
Consolidation of foundation soil of the Barcelona – Tarragona section of High- Speed railway.

Jet Grouting stabilization of a loose silt and sand layer to prevent settlement of the High Speed Railway embankment. Railway operation maintained during performance of the work. Jet grout column diameter of 800 mm to depths of 5 m to 7 m. Drilling inclination of 0° to 35° from verticality. Total of approximately 17.500 m of Jet Grout Columns for the Project

Santa Margarida | Jet grouding

Previous Next