Gypsum Mine at Montmorency

Consolidation for protection of the excavation of a section of the tunnel for access to the subterranean chalk cave in the side of Montmorency (Val d’Oise Region, 20 km north of Paris).

Jet Grouting consolidation for Baillet North entrance tunnel construction under populated area with buildings, to avoid possible settlements - sand, limestone, clay, marl and gypsum layers - installed over 200 Ø 600 mm columns - maximum drilling length over 55 m - total Jet Grouting about 3.000 m - unconfined compressive strength 4 MPa at 28 days.

 