Consolidation of foundation soil in the dock area of Mahon harbour (Minorca) with Jet Grouting technology.
2000 | 2001
Jet Grouting underpinning and consolidation treatments under pier structures to allow the deepening of the port channel - through pier's reinforced concrete structures and calcareous blocks in a silty sand matrix - 2 rows of overlapping interpenetrated Ø 700 mm columns at the depth of 10÷12 m - installed 285 columns - total drilling about 3500 m - total Jet Grouting about 980 m.