Construction of a road tunnel between the Rotello sud and Rotello Nord exits, for connection of s. croce di magliano and the Ururi- Rotello railwaystation.
2000 | 2002
S.Croce di Magliano - Rotello tunnel excavation with anchor bolted temporary supporting - final concrete lining and carriageways realization.